LUMINARY
from $2,380.00
- See Luminary Technical Brochure.
- Current lead time (4 weeks).
- Made from 3mm Corten Steel.
- Fully welded fire pit.
- Product pictured in black finish.
- Email us for a shipping quote of excluded
postcodes within the checkout portal.
Finish:
Quantity:
- See Luminary Technical Brochure.
- Current lead time (4 weeks).
- Made from 3mm Corten Steel.
- Fully welded fire pit.
- Product pictured in black finish.
- Email us for a shipping quote of excluded
postcodes within the checkout portal.
- See Luminary Technical Brochure.
- Current lead time (4 weeks).
- Made from 3mm Corten Steel.
- Fully welded fire pit.
- Product pictured in black finish.
- Email us for a shipping quote of excluded
postcodes within the checkout portal.